Hello iPad user! You should definitelydownload and try our free iPad app!

Published (M)

MaRS announces resumption of 20-storey "Phase 2" tower

  1. Resources
  2. MaRS Phase 2 Fact Sheet

    MaRS Phase 2 Press release

    Real Estate contact: rfroebelius@marsdd.com
    Media contact: Chris Stevenson chris@marsdd.com
    Images from announcement and high resolution renditions of Phase 2 

  3. Features:

    ● Total building area: 770,000 sq. ft. (rentable).

    ● 20 stories of lab and office space, generally designed as 60% lab space and 40% office space.

    ● Connected to the adjacent MaRS Heritage Building and towers through atria and a concourse-level food court.

    ● Direct connection to TTC (Queen"s Park subway station) and Toronto General Hospital.

    ● Two-level underground parking garage with dedicated bicycle parking and showers.

    ● Thermally broken high-performance unitized aluminum and double-glazed curtain wall with laminated glass accent fins.

    ● Atrium features: 62 ft.-high glazed skylight, metal mesh and terracotta walls and stone flooring.

    ● One of Toronto"s most prominent addresses for research and development, located in the heart of the Discovery District.

    ● Building designed to achieve LEED® Silver Certification.

  4. arnoldjon
    RT @MaRSDD: "5 Reasons why MaRS Phase 2 is good news for Toronto, Ontario, and Canada" http://awe.sm/5Ph3T a post by @IlseTreurnicht #phase2
    0 likes
     · 
    0 comments
  5. SparkliteTO
    Min. Glen Murray @glen4tc stands in front of a model of@MaRSDD Phase II, announced this morning. #ontinnovation #Ontario http://t.co/3j4AWMb
    0 likes
     · 
    0 comments
  6. 0 likes
     · 
    0 comments
  7. JacNicosia
    This is amazing! @MaRSDD RT: MaRS Phase 2: 20 storeys, double workforce, 800,000 sq. ft, $334 million investment, 4000 new jobs
    0 likes
     · 
    0 comments
  8. paulmaiero
    RT @startupnorth: RT @MaRSDD: MaRS Phase 2: 20 storeys, double workforce, 800,000 sq. ft, $334 million investment, 4000 new jobs
    0 likes
     · 
    0 comments
  9. One last photo from the @MaRSDD announcement. A full house - on two floors! @OntInnovation @Glen4TC #ontinnovation.
    0 likes
     · 
    0 comments
  10. As sunlight streams through the packed @MaRSDD Atrium,the audience looks on. http://twitpic.com/5w6bm2
    0 likes
     · 
    0 comments
  11. The MaRS atrium is packed with potentates.
  12. mikes_r
    Right now, beside @kristynwongtam at @MaRSDD for an announcement from @Glen4TC. #onpoli #ontario
    0 likes
     · 
    0 comments
  13. MaRSDD
    If you're at our big affair today, feel free to tweet your pics to @marsdd We'll add them to our live blog
    0 likes
     · 
    0 comments
  14. Nicole+ Shawn from @publichealthon getting ready for @MaRSDD announcement with @Glen4TC @IlseTreurnicht http://lockerz.com/s/123819669
    0 likes
     · 
    0 comments
  15. Invest_Toronto
    @MaRSDD vital #Toronto value prop. Excitement in air for announcement by @Glen4TC @IlseTreurnicht http://t.co/DeahMns http://t.co/pjy2fgb
    0 likes
     · 
    0 comments

Did you find this story interesting? Be the first to or comment.

Liked!
Total views
1117